Hired someone to seal/waterproof my 125 year old limestone foundation last week. There was one catch, though — in order to get a price i could afford i had to do the excavating. Approximately 100 feet of trench along two walls. 7'-8' deep along the back wall and the same at the top of the side wall, then sloping down from there. About 30" wide. Let me tell you, this is brutal work. One week down and i expect to finish by the end of next week.